Accha Deposit: Project stage – Pre-feasibility

  Cut-off Tonnes Grade Contained Metal
Zn
(%)
(x1000) Zn
(%)
Pb
(%)
Zn
(million lbs)
Pb
(million lbs)
Measured 2.0 2,492 8.71 0.78 478 43
5.0 1,791 10.73 0.90 424 36
8.0 1,161 13.03 1.03 333 26
Indicated 2.0 3,071 5.64 0.84 382 57
5.0 1,324 8.83 1.29 258 38
8.0 595 11.98 1.59 157 21

Measured
+ Indicated

2.0 5,563 7.01 0.82 860 100
5.0 3,115 9.92 1.07 681 73
8.0 1,756 12.67 1.22 491 47

 

  Cut-off
Zn
(%)
Tonnes
(x1000)
Zn
(%)
Pb
(%)
Contained Metal
Zn
(million lbs)
Pb
(million lbs)
Inferred 2.0 1,276 4.60 0.65 129 18
5.0 331 8.92 1.53 65 11
8.0 155 12.15 1.92 42 7

 

Stock Quote
15 minute delay

TSX – ZNC

Investor Relations

Adam Ho
Manager, Investor Relations

investorrelations@zincoremetals.com

+1 (604) 669 6611